Solar Parks from 4 MW

  • Client: prasina.gr - info@prasina.gr
  • Location: Western Macedonia
  • Surface Area: m2
  • Year Complete:
  • Value: $
  • Supervising Engineer:

Solar Parks from 4 MW in clusters of 17 energy communities  Total power 296ΜW(Project). 

 

  • The photovoltaic projects of the energy communities are “ready for construction” MW with a guaranteed tariff of 0.65 connection (complete substation and network).
  • The Prasina.gr platform manages project teams in groups of small projects connecting them to clusters, most of them open in 17 Energy Communities in the region of Western Macedonia.
  • Based on the total capacity of the “ready to build” substation (296MW), we accept the requests of investors who are interested in participating with us.
  • The Prasina.gr platform Undertakes the process for connecting the photovoltaic projects to CLUSTER that are located at a distance of 10 kilometers from the location of the substation.
  • The Prasina.gr platform undertakes the preparation of connection of small-scale installations of ready-made solar projects, the new project that will be created in the area by Greek and foreign investors (from 500 KW to 1000KW) will connect these projects to its interconnection network.
  • The construction of a substation with a total power of 296MW will be completed by the end of 2022.Those interested in investing in energy communities must complete the contact form and register.
  • Even small investors have the opportunity to participate, the groups of investors, buy new projects, or participate in affiliate groups of the projects
  • The construction of a substation with a total capacity of 296MW will be completed by the end of 2022.